Customer Rates and Fees

 


WATER RATES

SEWER RATES

OFFICE FEES

INSPECTION AND SAMPLING FEES

EQUIPMENT AND MATERIALS USAGE CHARGES

LABOR REPAIR CHARGES


 

WATER AND SEWER CHARGES

EFFECTIVE – January 1, 2024

PRINTABLE RATE AND FEE SCHEDULE

 

  • WATER RATES

WATER AVAILIBILITY

2023

2024

2025

2026

2027

Single Family, Multifamily (1st Unit)

 

and Non-Residential (1st ERU)

 

 

$12.87

 

 

$13.26

 

 

$13.65

 

 

$14.06

 

 

$14.49

+Charge per each additional unit $10.82 $11.15 $11.48 $11.83 $12.18
Residential – Privately Maintained Infrastructure (1st Unit)  

 

$12.38

 

 

$12.75

 

 

$13.13

 

 

$13.53

 

 

$13.93

+Charge per each additional unit $10.33 $10.64 $10.96 $11.29 $11.63
Mobile Home Parks – Utah Code

 

57-16-10 (1st Unit)

 

 

$10.85

 

 

$11.17

 

 

$11.51

 

 

$11.85

 

 

$12.21

+Charge per each additional unit $8.80 $9.06 $9.33 $9.61 $9.90

 

 

TIER VOLUME RATE ($/kgal) 2023 2024 2025 2026 2027
Single Family, Multifamily, and Mobile Home  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Tier 1 < 7,000 gals $1.67 $1.72 $1.77 $1.83 $1.88
 Tier 2 7,001 – 25,000 gals $2.09 $2.16 $2.22 $2.29 $2.36
 Tier 3 25,001 – 45,000 gals $2.68 $2.76 $2.84 $2.93 $3.02
 Tier 4 > 45,000 gals $3.77 $3.88 $4.00 $4.12 $4.24
Non-Residential          
  All Use  $2.13 $2.19 $2.26 $2.33 $2.40

 

 

Water Rate – Wholesale Accounts  2023  2024 2025 2026 2027
Volume rate (per 1,000 gal)  $2.53  $2.60  $2.68  $2.76  $2.84
Monthly base rate  Actual Cost

 

SEWER RATES
 

 

SEWER AVAILIBILITY 2023 2024 2025 2026 2027
Single Family, Multifamily (1st Unit),

 

and Non-Residential (1st ERU)

 

 

$13.05

 

 

$13.44

 

 

$13.84

 

 

$14.26

 

 

$14.68

+Charge per each additional unit $11.88 $12.23 $12.60 $12.98 $13.37
Residential – Privately Maintained Infrastructure (1st Unit)  

 

$12.78

 

 

$13.16

 

 

$13.55

 

 

$13.96

 

 

$14.38

+Charge per each additional unit $11.62 $11.97 $12.33 $12.70 $13.08
Mobile Home Parks – Utah Code

 

57-16-10 (1st Unit)

 

 

$11.96

 

 

$12.32

 

 

$12.69

 

 

$13.07

 

 

$13.46

+Charge per each additional unit $10.79 $11.11 $11.44 $11.79 $12.14
Small Unit  (1st Unit)

$10.03

 $10.33  $10.64  $10.96  $11.29
Central Valley Assessment (per ERU) $12.00 $12.00 $12.00 $12.00 $12.00
Central Valley Assessment (per ERU)-Small Unit $8.95 $8.95 $8.95 $8.95 $8.95
Sewer Surcharge Based on the different strengths of the discharge and the associated costs.

Central Valley Assessment Information

 

 

 

Volume Rate ($/kgal)*                          

 

 

2023

 

 

2024

 

 

2025

 

 

2026

 

 

2027

All Users $2.59 $2.66 $2.74 $2.83 $2.91

 

*(Based on average daily water usage calculated during the three winter months of December, January, and February)

NEW SEWER CUSTOMERS:

MONTHLY BASE RATE

Calculated using rate in appropriate year and user class per ERU per Billing Period.

 

VOLUME RATE CALCULATION:

Residential Customers-calculated using rate in appropriate year multiplied by six (6) per
ERU per Billing Period, (Until Winter Water Average Is Established) *
Non-Residential Customers-calculated using rate in appropriate year multiplied by an
(estimated usage) per ERU per Billing Period. (Until Winter Water Average Is
Established) *

SEWER ONLY CUSTOMERS:

Residential Customers-calculated using rate in appropriate year multiplied by six (6) per
ERU per Billing Period, plus the monthly base rate per ERU per Billing Period

 

 

BILLING PERIOD

Consists of one (1) month. Statements are mailed on or about the 8th of the month, due
on the 25th day of the month.

 

 

ERU – EQUIVALENT RESIDENTIAL UNITS

RESIDENTIAL

    • EACH SINGLE-FAMILY RESIDENCE
    • EACH APARTMENT IN A MULTIPLE UNIT DWELLING
    • EACH PAD IN A MOBILE HOME PARK

 

NON-RESIDENTIAL

     SEWER ERU-EACH 26 FIXTURE UNITS OR PORTION, WITHIN A BUSINESS (If Unavailable-BASED ON METER SIZE IN  AWWA EQUIVALENCY RATIO TABLE)

 

OFFICE FEES

 

 

Administrative Fee (actual not-to-exceed) $1000.00
After Hours Call $75.00
Certification Charge $20.00
Collection fee (40%) Actual Cost
Copy costs Actual Cost
EFT Return items, Other (actual not to exceed $25.00) $25.00
Interest on Unpaid Balance Per Month 1.5%
Meter test charge $50.00
Military Credit (per month actual not-to-exceed) $50.00
Refund Requests (per check) $25.00
Return Check Charge-Dishonored Payment $20.00
Telephone Calls Actual Costs
Tenant Account Set-Up Fee (per occurrence) $35.00
Trip Charge (Multiple visits to same location in same year of 3+) $25.00
Turn-On/Off Fee (Daytime-Special Request) $25.00
Unauthorized Meter Turn On/Off Fee (per occurrence) $75.00
Statement Fee-Additional (per statement) $1.00
Service Outside District Boundary Fee Actual Difference
Tampering or Destruction of District Equipment Actual+Adm fee

INSPECTION AND SAMPLING FEES 

 

Sampling Fee (Pretreatment) $150.00
Sampling Manhole Noncompliance Fee $150.00
Sewer Lateral Inspection (New Connection) $200.00

EQUIPMENT AND MATERIALS USAGE CHARGES

 

Vactor Truck w/1 operator per hr $225.00
Truck – Unit #6 per hr $40.00
Truck – Dump w/1 operator per hr $85.00
Truck – Pickup per hr $20.00
Lateral Inspection (existing customers) $100.00
Backhoe w/1 operator per hr $85.00
Compressor per hr $50.00
Pump – 2” per hr $30.00
Jumping Jack per hr $15.00
Viber Plate per hr $15.00
Saw cut machine per hr $25.00
Cut off saw per hr $25.00
Crane Truck per hr $50.00
Valve Truck per hr $50.00
TV Truck per hr $140.00
Materials Actual+Admin Fee
Water Loss (Estimated by Supervisor-Block 4 rate) Actual+Admin Fee

LABOR REPAIR CHARGES

Employee – Reg time rate per hr (Avg of water/sewer crew+supervisor) $60.00
Employee – Overtime rate per hr (1.5 x Reg time rate) $79.00
Tampering or Destruction of District Equipment Actual+Admin Fee